PowerPlan Enterprise(PPE)
Challenges
Synergy between enterprise management and project execution
Ensure that project schedules are aligned with business schedules and promote close collaboration and information sharing among departments and projects to drive project execution together.
Consistency in management communication and business collaboration
Schedule management needs to provide a platform for stakeholders to work and communicate together, and provide appropriate tools to facilitate information sharing and team collaboration.
Coordination between schedule precision and management efficiency
Establish schedule models tailored to different management levels, achieve top-down goal decomposition, and ensure flexible and efficient on-site schedule management.
Timeliness of data collection and management decision-making
In traditional management models, much data is scattered across systems or spreadsheets. We need a schedule-centered data mechanism to ensure timely, accurate collection for decision-making.
What is PPE
Power Plan Enterprise (PPE), an Enterprise Multi-level Plan Management & Control Platform that supports universal access across four terminals, is developed based on the principle of systematic thinking and guided by the internationally recognized Project Management Body of Knowledge (PMBOK). By integrating practical experience in plan and schedule management & control from both domestic and overseas practices, it delivers integrated management spanning from basic business processing to multi-stakeholder collaboration. Power Plan Enterprise (PPE) further serves as an integrated collaborative platform that enables the integration of project operation and enterprise support services, facilitates overall plan and schedule management & control, and realizes the unified coordination of schedule control and cost control.
Powered by the independently developed Enterprise Planning Engine (EPE) with proprietary intellectual property rights, Power Plan Enterprise (PPE) is an integrated project planning and schedule management & control platform built with advanced information technology under the guidance of the internationally accepted PMBOK framework. Tailored to the practical needs of three hierarchical levels within an enterprise—the execution level, management level, and decision-making level—Power Plan Enterprise (PPE) addresses key challenges including collaborative compilation of schedule plans, online approval and release, schedule inspection, schedule monitoring, and plan modification. It thereby establishes a closed-loop cycle for plan management & control, satisfies the overall management requirements of large and medium-sized projects such as quantitative control, schedule evaluation, and construction of management & control systems, and drives the achievement of project schedule objectives.
Core Functionality

Multi-level scheduling
Matching management hierarchy with scheduling hierarchy; gradually refining schedule from coarse to detailed at each level; automatically associating responsibility with planning hierarchy; and coordinating subcontracting planning with the schedule levels.
Schedule
Simple user interface and convenient operation; utilizes CPM algorithm for one-click scheduling optimization; online collaborative approval, aligned with workflow processes; and ability to quickly reference schedule templates and collaboratively develop schedules.


Issue Task
Establish multi-level schedule and permission hierarchy within the organization; unlimited management levels for flexible task assignment; assign tasks based on appearances, but control them at the substantive hierarchy level; and use task assignment to implement top-down schedule dissemination.
Progress Measurement
Flexible weight system for quantifying schedule; customizable resource distribution curves for more scientific planning; and multiple progress measurement methods to meet different types of task measurement requirements.


Schedule Analysis
Automatically generate project dashboards to provide a basis for management team decision-making; automatically produce progress S-curves; generate overall progress for each level of the schedule, tracing progress down the hierarchy; periodic progress reporting to ensure real-time progress; and automatic warnings to anticipate schedule risks in advance.
Application Value
- A solid foundation for streamlined organizational time management and cross-team collaboration
- A robust planning framework that underpins standardized PMO project governance
- A centralized command-and-coordination hub enabling project managers to lead teams with clarity and order
- A strategic resource optimization origin that drives optimal allocation of organizational resources
- A dedicated stakeholder collaboration interface fostering seamless alignment across all involved parties
- A real-time operational efficiency monitoring dashboard tracking and enhancing overall organizational performance
- A reliable evidence repository providing solid support for construction period dispute resolution and claim settlements